[{"data":1,"prerenderedAt":129},["ShallowReactive",2],{"service-telecommunication":3,"service-content-telecommunication":17},{"id":4,"menu_type_id":4,"parent_id":5,"is_child":6,"menu_title":7,"page_title":7,"icon":8,"slug":9,"link":8,"content":8,"page_banner":10,"menu_order":11,"meta_tag":7,"meta_title":7,"meta_description":7,"status":12,"publish_date":13,"expire_date":13,"created_at":14,"created_by":11,"updated_at":15,"updated_by":16},"3","2","1","Telecommunication","","telecommunication","622488_210290.jpg","0","Live",null,"2021-05-28 18:46:28","2022-02-22 09:51:26","4)",{"title":7,"tagline":18,"description":19,"stats":20,"features":21,"scopeItems":30,"items":31,"flagship":70,"processSteps":78,"standards":107,"processSubtitle":126,"standardsTitle":127,"standardsIntro":128},"Network Rollout · RF Optimization · Testing","Complete telecom network solutions — BTS, microwave, optical mux, antenna systems, tower infrastructure and result clearing for operators across Bangladesh.",[],[22,24,26,28],{"text":23},"BTS, microwave, optical mux and tower erection — complete installation, testing and commissioning for indoor and outdoor sites.",{"text":25},"RF optimization specialist teams — TEMS 8–15, ZAP Grab, GPS and SCFT drive test platforms for live network validation.",{"text":27},"Nationwide coverage — field teams deployed across all 64 districts of Bangladesh.",{"text":29},"Full lifecycle delivery — from site survey and route planning through testing, commissioning and ongoing AMC.",[],[32,37,41,44,48,51,55,59,63,67],{"name":33,"description":34,"color":35,"icon":36},"BTS Installation","BTS Installation, Testing and Commissioning (Both Indoor & Outdoor as well as IBS, Micro cell, Repeater, PICO, FEMTO, ATOM etc).","brand","\u003Ccircle cx='12' cy='12' r='2'\u002F\u002F>\u003Cpath d='M16.24 7.76a6 6 0 0 1 0 8.49m-8.48-.01a6 6 0 0 1 0-8.49m11.31-2.82a10 10 0 0 1 0 14.14m-14.14 0a10 10 0 0 1 0-14.14'\u002F\u002F>",{"name":38,"description":39,"color":35,"icon":40},"Microwave Links","Micro Wave Installation, Testing and Commissioning.","\u003Ccircle cx='18' cy='5' r='3'\u002F\u002F>\u003Ccircle cx='6' cy='12' r='3'\u002F\u002F>\u003Ccircle cx='18' cy='19' r='3'\u002F\u002F>\u003Cline x1='8.59' y1='13.51' x2='15.42' y2='17.49'\u002F\u002F>\u003Cline x1='15.41' y1='6.51' x2='8.59' y2='10.49'\u002F\u002F>",{"name":42,"description":43,"color":35,"icon":40},"Optical Mux","Optical Mux Installation & Commissioning.",{"name":45,"description":46,"color":35,"icon":47},"Rectifier and Battery Systems","Rectifier, Inverter, Isolation X-formers and Battery installation and Commissioning.","\u003Crect x='1' y='6' width='18' height='12' rx='2'\u002F\u002F>\u003Cline x1='23' y1='10' x2='23' y2='14'\u002F\u002F>",{"name":49,"description":50,"color":35,"icon":36},"Path LoS Report","Path LoS report preparation.",{"name":52,"description":53,"color":35,"icon":54},"RF Optimization","All types of RF Optimization (Indoor and outdoor BTS Dismantling, Extension Cabinet Installation, GSM Antenna optimization (Parameters, height and model change, MW link Dismantling etc)).","\u003Cpath d='M12 2a3 3 0 0 0-3 3v10a3 3 0 0 0 6 0V5a3 3 0 0 0-3-3z'\u002F\u002F>\u003Cpath d='M15 6h3'\u002F\u002F>\u003Cpath d='M18 9h4'\u002F\u002F>\u003Cpath d='M3 6h3'\u002F\u002F>\u003Cpath d='M6 9h4'\u002F\u002F>\u003Cpolyline points='9 14 9 22'\u002F\u002F>\u003Cpolyline points='15 14 15 22'\u002F\u002F>\u003Cline x1='6' y1='22' x2='18' y2='22'\u002F\u002F>",{"name":56,"description":57,"color":35,"icon":58},"Drive Test and Benchmarking","Site location selection according to GPS point, Transmission Root Selection, GSM Voice Drive Test Data Collection, GSM Data (GPRS\u002FEDGE) Drive Test, GSM Networks Benchmarking, WCDMA Voice & Data Drive Test, WCDMA Network Benchmark, International Border Drive Test (IB Drive), Physical optimization & Site Audit, Customer Complain (Walk Test), Single Site Functionality Test (SCFT) Data Collection, Documentation & Site Planning, Benchmarking, Network Benchmarking Drive tests performed on live networks to generate the competitive network performance and benchmark them with respect to their competitors' network.","\u003Cpath d='M22 11.08V12a10 10 0 1 1-5.93-9.14'\u002F\u002F>\u003Cpolyline points='22 4 12 14.01 9 11.01'\u002F\u002F>",{"name":60,"description":61,"color":35,"icon":62},"Power Systems","Generator, AC and Power Plant maintenance, Solar system installation.","\u003Ccircle cx='12' cy='12' r='4.5'\u002F\u002F>\u003Cline x1='12' y1='1.5' x2='12' y2='4'\u002F\u002F>\u003Cline x1='12' y1='20' x2='12' y2='22.5'\u002F\u002F>\u003Cline x1='4.2' y1='4.2' x2='6' y2='6'\u002F\u002F>\u003Cline x1='18' y1='18' x2='19.8' y2='19.8'\u002F\u002F>\u003Cline x1='1.5' y1='12' x2='4' y2='12'\u002F\u002F>\u003Cline x1='20' y1='12' x2='22.5' y2='12'\u002F\u002F>\u003Cline x1='4.2' y1='19.8' x2='6' y2='18'\u002F\u002F>\u003Cline x1='18' y1='6' x2='19.8' y2='4.2'\u002F\u002F>",{"name":64,"description":65,"color":35,"icon":66},"Operation and Maintenance Support","Operation and Maintenance Support (ICS Technology Ltd offers O & M services for existing deployed telecom networks. ICS Technology Ltd. has a large team and most of the team members have vast experienced with telecom operators in the area of network troubleshooting, solving every critical fault regarding Transmission & Radio network as well as telecom Power arena).","\u003Cpolyline points='22 12 18 12 15 21 9 3 6 12 2 12'\u002F\u002F>\u003Cline x1='12' y1='22' x2='12' y2='12'\u002F\u002F>\u003Cline x1='12' y1='12' x2='12' y2='4'\u002F\u002F>",{"name":68,"description":69,"color":35,"icon":66},"Software and Equipment","Software: Operating System – Windows 98\u002F2000\u002FXP, TEMS 10.0.5\u002F10.0.3\u002F9.0.3\u002F9.0.1\u002F8.0.1\u002F8.0.3, TEMS Investigation 15.3.6 (India edition Ascom Network Testing - Specially for Grameenphone), USB GPS software For BU-353, NET 3.5 For windows \u002F Windows Installer 3.1 \u002F Sony Ericsson PC suite, ZAP Grab. Equipment: Laptop, Sony Ericsson Handset (Model Nos: W995\u002FC702\u002FK790i\u002FK790c\u002FK800), TEMS Dongle (Version: 10.0.5\u002F10.0.3\u002F9.0.3\u002F9.0.1\u002F8.0.1\u002F8.0.3), USB mouse GPS, Data Cable, Inverter, External Antenna, USB Hub, Operator SIM card.",{"img":71,"description":72,"images":73},"\u002Fassets\u002Ftelecom-banner.jpg","Field test equipment deployed across Bangladesh — RF drive test platforms, 2G\u002F3G\u002F4G testing tools, and specialized drive test equipment for live network validation.",[74,75,76,77],"\u002Fassets\u002Ftelecom-rf-drive-test.png","\u002Fassets\u002Ftelecom-drive-test.png","\u002Fassets\u002Ftelecom-drive-test-dt.jpg","\u002Fassets\u002Ftelecom-2g-3g-4g-learn.jpg",[79,83,87,91,95,99,103],{"step":80,"title":81,"description":82},"01","Site Survey","Location feasibility, structural assessment and power availability.",{"step":84,"title":85,"description":86},"02","RF and Network Survey","GPS-based site selection, transmission route planning, GSM and WCDMA drive tests, benchmarking, IB drive, walk test and SCFT data collection.",{"step":88,"title":89,"description":90},"03","Design and Planning","RF planning, BOM, drawings and regulatory approvals.",{"step":92,"title":93,"description":94},"04","Supply","OEM equipment with customs clearance and logistics.",{"step":96,"title":97,"description":98},"05","Installation","BTS, antennas, microwave, cabling and grounding.",{"step":100,"title":101,"description":102},"06","Testing and T and C","RF testing, throughput tests and acceptance sign-off.",{"step":104,"title":105,"description":106},"07","Monitoring and AMC","NOC monitoring, preventive maintenance and rapid response.",[108,112,117,122],{"title":109,"description":110,"color":35,"icon":111},"TDRA Compliance","All installations meet Telecommunication Directorate regulatory requirements.","\u003Cpath d='M12 22s8-4 8-10V5l-8-3-8 3v7c0 6 8 10 8 10z'\u002F\u002F>",{"title":113,"description":114,"color":115,"icon":116},"ETSI Standards","Equipment and installation aligned with European telecommunications standards.","cyan","\u003Cpath d='M14 2H6a2 2 0 0 0-2 2v16a2 2 0 0 0 2 2h12a2 2 0 0 0 2-2V8z'\u002F\u002F>\u003Cpolyline points='14 2 14 8 20 8'\u002F\u002F>\u003Cline x1='16' y1='13' x2='8' y2='13'\u002F\u002F>\u003Cline x1='16' y1='17' x2='8' y2='17'\u002F\u002F>",{"title":118,"description":119,"color":120,"icon":121},"Site Safety","PPE protocols, climbing certification and safety audits on every site.","amber","\u003Ccircle cx='12' cy='8' r='6'\u002F\u002F>\u003Cpath d='M15.477 12.89 17 22l-5-3-5 3 1.523-9.11'\u002F\u002F>",{"title":123,"description":124,"color":125,"icon":58},"Quality Assurance","Multi-stage inspection, acceptance tests and comprehensive documentation.","emerald","From site survey through commissioning — a proven methodology for telecom network rollout.","Built to operate at scale.","Every telecom project meets international standards for RF performance, structural integrity and operational reliability — ensuring maximum uptime for your network.",1791797331558]